Are sliding doors for new openings right for your Reigate home?
A few practical points decide whether sliding doors for new openings suit a particular room and opening:
Turning a Reigate kitchen window into a door to the garden? Check where drains, gullies and air bricks sit outside, because they can affect the new threshold.
Thinking about a wider opening in Reigate but unsure of the size? Mark it out on the wall inside and out with tape, then picture the furniture and the view before you decide.
- Structural calculations are included in the guide price, and the Building Regulations application is handled as part of the project, so you are not left coordinating engineers and inspectors.
- If the work affects a party wall, notice can be served under the Party Wall etc. Act 1996 (England and Wales) before it starts, avoiding disputes with neighbours later.
- A structural engineer sizes the steel beam and padstones for the actual loads above, so the opening is designed rather than guessed.
Light and sun in Reigate
Daylight in Reigate runs from about 7 h 52 min in December to 16 h 35 min in June, with the noon sun at roughly 15° and 62° respectively. Use that to choose your glass: standard low-E double glazing for north and east elevations, and consider solar-control or triple glazing for sunny south and west walls.
What should you budget for sliding doors for new openings in Reigate?
Use these guide prices to budget for the whole job in Reigate: the door, the steelwork, making good and the engineer's calculations, including VAT. Building Control or warrant fees are charged by the council on top.
| Overall width | Typical panels | Guide price (fitted, inc VAT) |
|---|---|---|
| 1.5 m | 2 panels | £6,595–£7,295 |
| 2.1 m | 2 panels | £7,495–£8,295 |
| 2.4 m | 2 panels | £7,895–£8,895 |
See every size on the sliding doors for new openings page or try the guide price tool.
Timescales for sliding doors for new openings in Reigate
Here is the usual sequence in Reigate: guide price, free survey, written quote, any building work, then manufacture (typically 4–6 weeks for the door after the opening is measured; building work scheduled around approvals). Fitting typically takes 3–5 days of building work, then 1–2 days to fit the door. Nearby, we also survey in Redhill, Horley and Dorking.
Do you need approval in Reigate?
In England, forming or widening an opening is structural work that needs a Building Regulations application, structural calculations and usually a steel beam on padstones. The new door is also a controlled fitting (U-value 1.4 W/m²K or better if more than 60% glazed). If steelwork bears on a party wall, the Party Wall etc. Act 1996 may apply.
Finishes and extras for sliding doors for new openings
- Temporary door or boarding. A secure, weathertight closure while the made-to-measure door is being manufactured.
- Steel beam with padstones. A beam sized by the engineer to carry the wall, floors and roof above.
- Low threshold detail. Adjusting floor and outside levels during the building work to allow a lower sill.
Questions about sliding doors for new openings in Reigate
Do I need building approval for sliding doors for new openings in Reigate?
In England a replacement door is a controlled fitting, so compliance is arranged through a competent person scheme installer or Building Control; new openings need a Building Regulations application. We confirm the right route for your property at survey, so the paperwork is in place before fitting.
How much does it cost to widen an opening for sliding doors?
Our guide price for forming or widening an opening is £3,595 for 2.4 m and £4,495 for 4.8 m, covering steel, padstones, making good and structural calculations. The door is priced separately, and Building Control fees are set by your council. All figures are guide prices inc VAT, fixed in a written quote after we survey the wall and see what is above it.
Do I need planning permission for a new opening?
Planning rules for altering an elevation depend on the property and where you are, so it is worth checking with your council before you commit. Flats, listed buildings and properties covered by an Article 4 direction are the most likely to need consent. Wales and Scotland have their own planning rules. Our planning guide sets out the questions to ask.
Does the Party Wall Act apply to my new opening?
The Party Wall etc. Act 1996 (England and Wales) may apply if the new steel beam bears on, or is cut into, a wall you share with a neighbour, as is common in semi-detached and terraced houses. If it applies, you must serve notice on the neighbour before the work starts. A rear wall entirely on your own property is less likely to be affected.