- Postcode district
- SY8
- Survey
- Free for new and replacement doors
- Typical lead time
- Typically 4–6 weeks for aluminium and 2–4 weeks for uPVC after survey sign-off
- Guide price
- From £3,295 inc VAT
- Nearby
- Tenbury Wells, Leominster, Church Stretton
- Building rules
- England
Are replacement sliding doors right for your Ludlow home?
Before you settle on a door type, it helps to know what replacement sliding doors do well and what to check before you order.
Considering a wider door for your Ludlow home while you are replacing it? Weigh up the extra cost of structural work against the gain in glass before deciding.
Before booking a survey for a Ludlow flat, check your lease or title deeds and speak to the managing agent, factor or other owners, because doors in flats may need consent that houses do not.
- Certification through a competent person scheme installer, or notification to Building Control, is arranged as part of the job and gives you a record for when you sell.
- Multipoint locks, anti-lift devices and internally beaded glass close the security gaps that older patio doors commonly have, such as panels that can be lifted out.
- New rollers and a precision track make a heavy door glide with a light push, where an old door may need both hands and a firm shove to open.
How much sun will a door in Ludlow get?
Daylight in Ludlow runs from about 7 h 40 min in December to 16 h 48 min in June, with the noon sun at roughly 14° and 61° respectively. Use that to choose your glass: standard low-E double glazing for north and east elevations, and consider solar-control or triple glazing for sunny south and west walls.
What should you budget for replacement sliding doors in Ludlow?
Guide prices are the same across Shropshire: the fitted price depends on the size, system and specification, not your postcode. These figures are for a standard 2.1 m high door, fitted, including VAT and removal of an old door of similar size.
| Overall width | Typical panels | Guide price (fitted, inc VAT) |
|---|---|---|
| 1.5 m | 2 panels | £3,295–£4,095 |
| 2.4 m | 2 panels | £4,295–£5,295 |
| 4.0 m | 3 panels | £6,095–£7,395 |
See every size on the replacement sliding doors page or try the guide price tool.
What happens when you order replacement sliding doors in Ludlow?
A surveyor visits your Ludlow home to measure the structural opening, check levels and the lintel, and talk through glass and finish. Once you confirm the written specification, the door is made to measure — typically 4–6 weeks for aluminium and 2–4 weeks for uPVC after survey sign-off — and fitting usually takes 1 day for a straight two-panel swap; 1–2 days for larger doors. We also cover Tenbury Wells (12 km south-east) and Leominster (17 km south).
Do you need approval in Ludlow?
English Building Regulations treat a new or replacement external door in an existing home as a controlled fitting: it needs a U-value of 1.4 W/m²K or better (or Doorset Energy Rating band C) if more than 60% of it is glazed (Approved Document L), and safety glass in a critical location (Approved Document K). Compliance is arranged through a competent person scheme installer or a Building Control notification, so you get a certificate for your records.
Finishes and extras for replacement sliding doors
- Slimline upgrade. Narrow interlocks for the maximum glass area the existing opening allows.
- Upgraded glass. Triple, laminated, solar-control or obscure glass to suit the elevation.
- New internal cill or board. A fresh window board or reveal lining to finish the inside neatly.
Questions about replacement sliding doors in Ludlow
How soon can you survey in Ludlow?
Surveys in the SY8 district are booked at a time that suits you, and we offer survey dates when we reply to your enquiry. After you approve the written quote, manufacture is typically 4–6 weeks for aluminium and 2–4 weeks for uPVC after survey sign-off.
How long does it take to replace a sliding patio door?
Replacing a two-panel sliding patio door typically takes one day, from removing the old door to sealing and trimming the new one. Larger doors, three- or four-panel sets and doors needing extra making good typically take one to two days. Manufacture comes first, typically 4–6 weeks for aluminium or 2–4 weeks for uPVC after you sign off the surveyed specification.
Do I need building regulations approval to replace a patio door?
In England a replacement door is a controlled fitting, so it must meet the Building Regulations for energy and safety glazing. You do not apply in advance; instead the work is self-certified by a competent person scheme installer or notified to Building Control, which we arrange. In Scotland like-for-like replacement in a house usually needs no building warrant but must still meet the building standards.
Can I get a bigger door in the same opening?
You can usually get more glass in the same opening, because modern frames are slimmer, but the overall door size stays roughly the same as the old one. Making the door wider or taller means widening the opening, which is structural work with a steel beam, calculations and a Building Regulations application. Our new openings page covers that.

