- Postcode district
- HA8
- Survey
- Free for new and replacement doors
- Typical lead time
- Typically 3–5 weeks after survey sign-off, depending on the door leaf and finish
- Guide price
- From £895 inc VAT
- Nearby
- Mill Hill, Hendon, Finchley
- Building rules
- England
Is an internal pocket door a good fit for your home in Edgware?
A few practical points decide whether internal pocket doors suit a particular room and opening:
Planning an open-plan kitchen in Edgware but still want to close it off now and then? A double pocket door gives you both.
If your Edgware home has a cramped en suite where the door clashes with the basin, a pocket door is worth measuring for before you consider moving the sanitaryware.
- Top-hung rollers carry the weight of the leaf from above, so there is no floor track to trip over, clean around or catch the vacuum cleaner on.
- Soft-close dampers can slow the door in its final few centimetres in both directions, stopping it slamming shut or bouncing back out of the pocket.
- The door leaf can be chosen to match the other internal doors in the house, such as painted panels, oak veneer or a glazed design, so it does not look out of place.
Sunlight, glass and orientation in Edgware
Internal glazed doors are mostly about borrowed light. In Edgware, winter daylight lasts only around 7 h 48 min, so a glass door between a bright extension and a darker hallway or dining room can make a noticeable difference from November to February.
Guide prices for internal pocket doors in Edgware
Guide prices are the same across Greater London. They cover the door supplied and fitted into a prepared opening, including VAT, with options itemised in your quote.
| Overall width | Typical panels | Guide price (fitted, inc VAT) |
|---|---|---|
| Single pocket door | 1 leaf | £895–£1,595 |
| Double pocket door | 2 leaves | £1,695–£2,795 |
See every size on the internal pocket doors page or try the guide price tool.
From survey to fitted door in Edgware
Here is the usual sequence in Edgware: guide price, free survey, written quote, then manufacture (typically 3–5 weeks after survey sign-off, depending on the door leaf and finish). Fitting typically takes 1–2 days, plus drying time before new plaster can be decorated.
Rules for internal pocket doors in England
Internal doors are generally outside the Building Regulations notification rules, with two things to watch: we only use safety glazing in glass doors, in line with Approved Document K, and any change to a load-bearing wall needs structural advice and Building Control approval.
Specification choices for internal pocket doors in Edgware
- Single pocket door. One leaf sliding into one side of the wall, the usual choice for en suites and cupboards.
- Soft-close dampers. Hidden dampers in the track that ease the door to a gentle stop at each end.
- Glazed leaf. A door with safety glass panels that borrows daylight from one room for another.
Questions about internal pocket doors in Edgware
How soon can you survey in Edgware?
Surveys in the HA8 district are booked at a time that suits you, and we offer survey dates when we reply to your enquiry. After you approve the written quote, manufacture is typically 3–5 weeks after survey sign-off, depending on the door leaf and finish.
How much does an internal pocket door cost?
Our guide price for a fitted internal pocket door is £895–£1,595 for a single and £1,695–£2,795 for a double, inc VAT at standard height. Where your door falls in that range depends on the leaf, the hardware, the wall construction and how much making good is needed. The final figure is fixed in a written quote after we have surveyed the wall.
Do pocket doors need a floor track?
No, the pocket doors we fit hang from rollers on a top track, so the floor stays clear and level through the doorway. A small guide at the mouth of the pocket keeps the leaf running straight without a groove across the floor. That makes them easy to clean around and suitable where the same flooring runs from room to room.
How long does it take to fit a pocket door?
Fitting a pocket door typically takes one to two days, depending on whether the wall is stud or masonry and how much needs opening up. New plaster then needs time to dry before it can be decorated. We agree the order of work with you at survey so other trades, such as an electrician or decorator, can be booked around it.

