- Postcode district
- EX31
- Survey
- Free for new and replacement doors
- Typical lead time
- Typically 4–6 weeks for the door after the opening is measured; building work scheduled around approvals
- Guide price
- From £6,595 inc VAT
- Nearby
- Bideford, Ilfracombe, Okehampton
- Building rules
- England
New and widened openings for sliding doors in Barnstaple: what to know
Most homeowners choosing sliding doors for new openings want the same things: more light, a clear view and a door that is easy to live with.
Where a Barnstaple house has a bay, chimney breast or upstairs window directly above the planned opening, the engineer will need to account for it in the steel design.
Living in a Barnstaple flat? Structural changes to an external wall almost always need the agreement of the building's owner or the other owners, so speak to them first.
- Temporary propping holds up the wall above while the masonry is cut out, keeping floors, ceilings and the roof safely supported throughout the work.
- The door is measured from the finished opening rather than from drawings, so it fits the opening as built, not as it was intended to be built.
- If the work affects a party wall, notice can be served under the Party Wall etc. Act 1996 (England and Wales) before it starts, avoiding disputes with neighbours later.
How much sun will a door in Barnstaple get?
Daylight in Barnstaple runs from about 7 h 54 min in December to 16 h 34 min in June, with the noon sun at roughly 15° and 62° respectively. Use that to choose your glass: standard low-E double glazing for north and east elevations, and consider solar-control or triple glazing for sunny south and west walls.
Typical costs for sliding doors for new openings around Barnstaple
These figures combine an aluminium sliding door with the building work to form or widen the opening, including structural calculations and VAT. Your price is fixed in a written quote once the wall in your Barnstaple home has been surveyed; council fees are extra.
| Overall width | Typical panels | Guide price (fitted, inc VAT) |
|---|---|---|
| 2.1 m | 2 panels | £7,495–£8,295 |
| 3.0 m | 2 panels | £8,795–£9,895 |
| 4.8 m | 4 panels | £11,495–£12,995 |
See every size on the sliding doors for new openings page or try the guide price tool.
From survey to fitted door in Barnstaple
Nothing is ordered until you sign off the surveyed specification. The door is made from the finished opening sizes (typically 4–6 weeks for the door after the opening is measured; building work scheduled around approvals), and fitting usually takes 3–5 days of building work, then 1–2 days to fit the door. If you are in Bideford or Ilfracombe, the same process and prices apply.
Rules for sliding doors for new openings in England
A new or wider opening in England needs Building Control approval for the structural work as well as compliance for the door itself under Approved Documents L and K. Expect structural calculations, a steel beam and, where a party wall is involved, notices under the Party Wall etc. Act 1996.
Choosing the specification
- Steel beam with padstones. A beam sized by the engineer to carry the wall, floors and roof above.
- Low threshold detail. Adjusting floor and outside levels during the building work to allow a lower sill.
- Widening an existing door. Removing masonry each side of an old patio door to take a wider slider.
Questions about sliding doors for new openings in Barnstaple
How soon can you survey in Barnstaple?
Surveys in the EX31 district are booked at a time that suits you, and we offer survey dates when we reply to your enquiry. After you approve the written quote, manufacture is typically 4–6 weeks for the door after the opening is measured; building work scheduled around approvals.
Do I need a steel beam for sliding doors?
A widened or new opening usually needs a steel beam or a suitable lintel to carry the wall and anything above it, and for wider openings a steel beam is the usual answer. A structural engineer chooses the size and bearing details based on the loads. The beam is placed on padstones at each end to spread its load into the masonry.
How long does it take to form a new opening?
Forming or widening an opening typically involves 3–5 days of building work, including propping, cutting out, installing the steel and padstones, and making good. The sliding door is then made to the finished opening, which typically takes 4–6 weeks for aluminium, so a secure temporary closure is fitted in between. The door itself typically goes in within one to two days.
Do I need planning permission for a new opening?
Planning rules for altering an elevation depend on the property and where you are, so it is worth checking with your council before you commit. Flats, listed buildings and properties covered by an Article 4 direction are the most likely to need consent. Wales and Scotland have their own planning rules. Our planning guide sets out the questions to ask.