- Postcode district
- TN33
- Survey
- Free for new and replacement doors
- Typical lead time
- Typically 4–6 weeks for aluminium and 2–4 weeks for uPVC after survey sign-off
- Guide price
- From £3,295 inc VAT
- Nearby
- Bexhill-on-Sea, Hastings, Heathfield
- Building rules
- England
What replacement sliding doors offer homes in Battle
The right door depends on the opening, the room and the way you use the garden. Here is how replacement sliding doors tend to work out in practice:
If your Battle home still has its original sliding patio door, look at the glass beads: if they are on the outside, a replacement will close off that weakness.
Selling a house in Battle in the next few years? Keep the competent person scheme certificate or Building Control notice for the new door with your property paperwork.
- Certification through a competent person scheme installer, or notification to Building Control, is arranged as part of the job and gives you a record for when you sell.
- New rollers and a precision track make a heavy door glide with a light push, where an old door may need both hands and a firm shove to open.
- Most two-panel replacements are completed in a single day, so the house is secure again by the evening without the room being out of use for long.
Light and sun in Battle
In Battle the shortest day has roughly 7 h 55 min of daylight and the longest about 16 h 32 min. The noon sun sits near 16° above the horizon in winter and 63° in summer — so glass that faces south collects useful warmth from October to March, while a west-facing door may need solar control to stop it overheating in July.
How much do replacement sliding doors cost in Battle?
Guide prices are the same across East Sussex: the fitted price depends on the size, system and specification, not your postcode. These figures are for a standard 2.1 m high door, fitted, including VAT and removal of an old door of similar size.
| Overall width | Typical panels | Guide price (fitted, inc VAT) |
|---|---|---|
| 3.0 m | 2 panels | £4,995–£6,095 |
| 4.8 m | 4 panels | £6,995–£8,495 |
| 6.0 m | 4 panels | £8,295–£10,095 |
See every size on the replacement sliding doors page or try the guide price tool.
Survey, manufacture and fitting around Battle
Here is the usual sequence in Battle: guide price, free survey, written quote, then manufacture (typically 4–6 weeks for aluminium and 2–4 weeks for uPVC after survey sign-off). Fitting typically takes 1 day for a straight two-panel swap; 1–2 days for larger doors. Nearby, we also survey in Bexhill-on-Sea, Hastings and Heathfield.
Do you need approval in Battle?
English Building Regulations treat a new or replacement external door in an existing home as a controlled fitting: it needs a U-value of 1.4 W/m²K or better (or Doorset Energy Rating band C) if more than 60% of it is glazed (Approved Document L), and safety glass in a critical location (Approved Document K). Compliance is arranged through a competent person scheme installer or a Building Control notification, so you get a certificate for your records.
Finishes and extras for replacement sliding doors
- Aluminium replacement. A thermally broken aluminium slider with slim frames and a durable powder-coat finish.
- Slimline upgrade. Narrow interlocks for the maximum glass area the existing opening allows.
- New internal cill or board. A fresh window board or reveal lining to finish the inside neatly.
Questions about replacement sliding doors in Battle
Can you match other doors and windows in my Battle home?
Usually, yes. Most aluminium and uPVC systems come in standard RAL colours and finishes, and we can quote dual colour where the inside and outside need to differ. Bring photos of existing frames to the survey.
How long does it take to replace a sliding patio door?
Replacing a two-panel sliding patio door typically takes one day, from removing the old door to sealing and trimming the new one. Larger doors, three- or four-panel sets and doors needing extra making good typically take one to two days. Manufacture comes first, typically 4–6 weeks for aluminium or 2–4 weeks for uPVC after you sign off the surveyed specification.
Will the new door have a lower threshold?
A lower threshold may be possible on a replacement, depending on the floor level inside, the height of the patio or ground outside and how the opening was built. Low thresholds are typically 15–25 mm. A flush threshold needs a drainage channel outside so rain cannot run in. We check levels at survey and tell you what is realistic.
What happens to my old patio door?
We remove your old patio door and take it away for disposal as part of the job, and that is included in our guide prices, so there is nothing for you to arrange. If you would rather keep the old door, for example for a shed or greenhouse project, tell us before the fitting day and we will leave it safely on site.

