- Postcode district
- CV11
- Survey
- Free for new and replacement doors
- Typical lead time
- Typically 4–6 weeks for aluminium and 2–4 weeks for uPVC after survey sign-off
- Guide price
- From £3,295 inc VAT
- Nearby
- Bedworth, Hinckley, Atherstone
- Building rules
- England
Why choose replacement sliding doors in Nuneaton?
Before you settle on a door type, it helps to know what replacement sliding doors do well and what to check before you order.
Selling a house in Nuneaton in the next few years? Keep the competent person scheme certificate or Building Control notice for the new door with your property paperwork.
Does the old door in your Nuneaton kitchen whistle in the wind or leave puddles on the sill? Worn seals and failed drainage are common reasons to replace rather than repair.
- Certification through a competent person scheme installer, or notification to Building Control, is arranged as part of the job and gives you a record for when you sell.
- Slimmer modern frames often give a larger area of glass within the same opening, letting more daylight into the room than the old door did.
- Removal and disposal of your old patio door is included in our guide prices, so there is no separate skip or tip run to organise.
Planning glass for the light in Nuneaton
Daylight in Nuneaton runs from about 7 h 39 min in December to 16 h 50 min in June, with the noon sun at roughly 14° and 61° respectively. Use that to choose your glass: standard low-E double glazing for north and east elevations, and consider solar-control or triple glazing for sunny south and west walls.
Sliding door replacement prices in Nuneaton
Guide prices are the same across Warwickshire: the fitted price depends on the size, system and specification, not your postcode. These figures are for a standard 2.1 m high door, fitted, including VAT and removal of an old door of similar size.
| Overall width | Typical panels | Guide price (fitted, inc VAT) |
|---|---|---|
| 1.5 m | 2 panels | £3,295–£4,095 |
| 2.1 m | 2 panels | £3,995–£4,895 |
| 6.0 m | 4 panels | £8,295–£10,095 |
See every size on the replacement sliding doors page or try the guide price tool.
From survey to fitted door in Nuneaton
We plan the job around your home in Nuneaton: survey first, then a written quote, then manufacture (typically 4–6 weeks for aluminium and 2–4 weeks for uPVC after survey sign-off). The fitting itself usually takes 1 day for a straight two-panel swap; 1–2 days for larger doors. If you are in Bedworth or Hinckley, the same process and prices apply.
Rules for replacement sliding doors in England
English Building Regulations treat a new or replacement external door in an existing home as a controlled fitting: it needs a U-value of 1.4 W/m²K or better (or Doorset Energy Rating band C) if more than 60% of it is glazed (Approved Document L), and safety glass in a critical location (Approved Document K). Compliance is arranged through a competent person scheme installer or a Building Control notification, so you get a certificate for your records.
Choosing the specification
- uPVC replacement. A cost-conscious choice for a straightforward swap, available in white and foiled colours.
- Upgraded glass. Triple, laminated, solar-control or obscure glass to suit the elevation.
- New internal cill or board. A fresh window board or reveal lining to finish the inside neatly.
Questions about replacement sliding doors in Nuneaton
How soon can you survey in Nuneaton?
Surveys in the CV11 district are booked at a time that suits you, and we offer survey dates when we reply to your enquiry. After you approve the written quote, manufacture is typically 4–6 weeks for aluminium and 2–4 weeks for uPVC after survey sign-off.
What happens to my old patio door?
We remove your old patio door and take it away for disposal as part of the job, and that is included in our guide prices, so there is nothing for you to arrange. If you would rather keep the old door, for example for a shed or greenhouse project, tell us before the fitting day and we will leave it safely on site.
Do I need building regulations approval to replace a patio door?
In England a replacement door is a controlled fitting, so it must meet the Building Regulations for energy and safety glazing. You do not apply in advance; instead the work is self-certified by a competent person scheme installer or notified to Building Control, which we arrange. In Scotland like-for-like replacement in a house usually needs no building warrant but must still meet the building standards.
How long does it take to replace a sliding patio door?
Replacing a two-panel sliding patio door typically takes one day, from removing the old door to sealing and trimming the new one. Larger doors, three- or four-panel sets and doors needing extra making good typically take one to two days. Manufacture comes first, typically 4–6 weeks for aluminium or 2–4 weeks for uPVC after you sign off the surveyed specification.

